01
Plan an Agricultural IoT Project
Know the field problem but not the equipment? Start with a practical farm system plan.
Explore solutionsDiscuss your projectSunGene · Your farm. A clear equipment plan.
Tell us what your farm needs to measure, connect or improve. We help plan the whole-farm system and equipment list (BOM), source suitable equipment and handle software integration when needed.
One device. One field. Your next step.
Start with a short description. A complete equipment list is not required.

A replacement sensor, a first monitoring point or a whole-farm plan — you can start here.
01
Know the field problem but not the equipment? Start with a practical farm system plan.
Explore solutionsDiscuss your project02
Find a device, add a measurement point or check a connection to your existing controller.
Explore equipmentGet selection help03
Missing data, unstable connections or power problems? Start with the symptom.
View support optionsDescribe the problemTell us what you want to know or improve. Share what is already on site.
Plan the architecture and BOM, source equipment and handle the agreed integration.
Carry out site construction, installation and wiring. We can help contact and coordinate them.

Bring soil conditions, local weather and equipment status into a system your team can use.

Plan sensing, field power, communication and platform integration around the water decisions you need to make.

Connect growing-zone measurements and existing equipment to a clear, maintainable data workflow.
Two anonymized records from project planning. Each shows the constraint, the proposed response and what remained to verify.
Configuration review
A farm logger needed one more equipment-status input while retaining the required network and upload interface.
Compare a larger logger with a compatible input expansion module. The reviewed direction used the small expansion module.
An updated equipment configuration and an interface check list.
Stage & next checkProposal review; final compatibility, testing and delivery still required.
Read the project recordEngineering plan
The receiving platform needed the original measurement time, station identity and records after a connection interruption.
Define storage, record identity, acknowledgement and recovery tests alongside the platform interface.
A data-delivery contract and an outage/recovery test scope.
Stage & next checkPlanned checks; no passed test or accepted deployment is claimed.
Read the project record01
Review sensors, controllers, connectivity and power together, including equipment you may be able to keep.
02
Compare interfaces, versions and accessories so the equipment list matches the system you need.
03
Coordinate equipment supply and any agreed software work. Confirm local installation responsibilities and costs before the final quotation.
SunGene handles equipment sourcing, farm system architecture and the agreed software or integration work. On-site construction and installation are carried out by local teams; we can help you find and coordinate a suitable partner.
From a single replacement to a farm equipment list. Compare these product families, then confirm the version for your site.
Product family — select the required version before ordering.
Keep your existing PLC, SCADA, platform and customer relationship. Work with us on equipment alone, a farm BOM or a defined integration scope. Sample, single-device, pilot and repeat-order requests are welcome.
For integrators & equipment buyersAndy is your contact for equipment requests, farm planning and technical questions. Start with a short message; the next step is to review the fit and any missing information. Additional engineering work and charges are agreed before proceeding.
Company location: Taichung, Taiwan. WhatsApp is a messaging channel (+86 181 4413 2078); it is not an office address. You can use the form or email instead.
Know who you are working with →Additional engineering work and any charges are agreed before proceeding.
See the full quotation processStart with a short description. A complete equipment list is not required.
Contact SunGene