Company & procurement brief
Company identity, responsibilities, quotation checklist, documents and support process.
Version 1.0 · 2026-09-16 · EN · PDF
Download PDFSunGene · Procurement & documentation
Equipment procurement, farm BOM planning and agreed integration—with the model, costs and responsibilities clear before you commit.
Work with SunGene
Choose a starting point. You do not need a finished specification, and equipment supply can stand on its own.
“I need to add or replace something.”
A selected device and the accessories needed to connect it to your equipment.
Equipment and accessories, plus shipping. Add configuration or technical work only when needed.
A model or photo, the job it must do and your country. Quantity can follow.
Discuss this scope“I need the parts for one monitoring task.”
A coordinated equipment list: sensing, data collection, connectivity and power as needed. Kit pages are starting configurations, not fixed SKUs.
The selected equipment package, agreed configuration and shipping. Your existing equipment may reduce the package.
What you want to monitor, the site and any available power or network.
Discuss this scope“I want to check it works before expanding.”
A limited scope, equipment configuration, agreed checks, results and a list of any open issues.
Equipment plus the agreed test and integration work. Wider rollout is a separate decision.
One result you want to prove and a suitable first site. We can help define the test.
Discuss this scope“I need the whole system planned.”
Farm architecture, equipment list (BOM), agreed software/data integration, testing and handover scope.
Equipment and engineering scope first; local installation scope and costs next; then the final quotation.
Your farm goal, country, approximate number of sites and what is already installed.
Discuss this scopeA product page describes a device family. A kit combines equipment. A pilot checks an agreed result before a wider project. You can keep your existing platform and customer relationship.
Review the whole project budget. Your written proposal identifies the included scope and any optional or recurring charges.
Selected devices, accessories, configuration, freight and applicable import costs.
Planning, data mapping, software functions and tests included in your agreed scope.
Site survey, wiring, mounting and construction priced with the responsible local team.
SIM/data, platform subscriptions, maintenance or support only where required and agreed.
Taichung · Taiwan
SunGene is a Taiwan-based agricultural IoT project and equipment partner. We coordinate equipment sourcing and the agreed engineering work with manufacturing and technology partners.
SunGene Co., Ltd.
上瑾錸有限公司
1F., No. 201, Guangfu Rd., Central District, Taichung City, Taiwan
Check the official company registerSearch by registration number 94111922 or 上瑾錸有限公司.
Compare uses, interfaces and configuration options. These are selection references.
An SG code helps identify a sourcing option; it is not a substitute for the manufacturer model or its certificate.
Confirm the exact model, configuration, photograph, document revisions, accessories, price, delivery and warranty.
Discuss the requirement, existing equipment and site constraints.
Confirm the equipment configuration, BOM and equipment prices.
Confirm the local installation scope and costs with the responsible team.
Agree the final quotation, deliverables, testing, acceptance and support before work starts.
Specify the checks required: model and accessory count, configuration record, agreed functional checks and shipping documents. Tests, calibration and inspection services must be included in the scope; they are not implied by a catalogue listing.
Send the order or case reference, model, symptom and useful photos. We review the issue and applicable terms before agreeing repair, replacement or additional technical work. Confirm return instructions before shipping equipment. Share remote access only after scope and authorization are agreed.
If a device needs attention →Review our company and cooperation scope, or use the editable templates to prepare a project. No contact details are required to download.
Company identity, responsibilities, quotation checklist, documents and support process.
Version 1.0 · 2026-09-16 · EN · PDF
Download PDFEditable requirements, equipment review and acceptance checklists, plus a worked data payload example.
Version 1.0 · 2026-09-16 · EN · ZIP
Download ZIPTemplates and sample data support discussion. They are not an exact-model wiring diagram, register map or evidence of a completed deployment.
Andy is your contact for equipment requests, farm planning and technical questions. Start with a short message; the next step is to review the fit and any missing information. Additional engineering work and charges are agreed before proceeding.
Company location: Taichung, Taiwan. WhatsApp is a messaging channel (+86 181 4413 2078); it is not an office address. You can use the form or email instead.
Know who you are working with →Our published guides and anonymized planning examples show selection and integration decisions. Their stated stage matters: they are not presented as accepted deployments or customer testimonials.
Read project examples and technical guides →