Company & procurement brief
Company identity, responsibilities, quotation checklist, documents and support process.
Version 1.3 · 2026-10-02 · EN · PDF
Download PDFSunGene · Procurement & documentation
Equipment procurement, farm BOM planning and agreed integration—with the model, costs and responsibilities clear before you commit.
Work with SunGene
You can order a device, request a kit or discuss a larger project. Tell us the equipment or service you need.
“I need to add or replace something.”
A selected device and the accessories needed to connect it to your equipment.
Equipment and accessories, plus shipping. Add configuration or technical work only when needed.
A model or photo, the job it must do and your country. Quantity can follow.
Ask about this option“I need the parts for one monitoring task.”
A coordinated equipment list: sensing, data collection, connectivity and power as needed. Kit pages are starting configurations, not fixed SKUs.
The selected equipment package, agreed configuration and shipping. Your existing equipment may reduce the package.
What you want to monitor, the site and any available power or network.
Ask about this option“I want to check it works before expanding.”
A limited scope, equipment configuration, agreed checks, results and a list of any open issues.
Equipment plus the agreed test and integration work. Wider rollout is a separate decision.
One result you want to prove and a suitable first site. We can help define the test.
Ask about this option“I need the whole system planned.”
Farm architecture, equipment list (BOM), agreed software/data integration, testing and handover scope.
Equipment and engineering scope first; local installation scope and costs next; then the final quotation.
Your farm goal, country, approximate number of sites and what is already installed.
Ask about this optionA product page describes a device family. A kit combines equipment. A pilot checks an agreed result before a wider project. You can keep your existing platform and customer relationship.
Review the whole project budget. Your written proposal identifies the included scope and any optional or recurring charges.
Selected devices, accessories, configuration, freight and applicable import costs.
Planning, data mapping, software functions and tests included in your agreed scope.
Site survey, wiring, mounting and construction priced with the responsible local team.
SIM/data, platform subscriptions, maintenance or support only where required and agreed.
Taichung · Taiwan
SunGene is a Taiwan-based agricultural IoT project and equipment partner. We coordinate equipment sourcing and the agreed engineering work with manufacturing and technology partners.
SunGene Co., Ltd.
上瑾錸有限公司
1F., No. 201, Guangfu Rd., Central District, Taichung City, Taiwan
Check the official company registerSearch by registration number 94111922 or 上瑾錸有限公司.
Compare uses, interfaces and configuration options. These are selection references.
An SG code helps identify a sourcing option; it is not a substitute for the manufacturer model or its certificate.
Confirm the exact model, configuration, photograph, document revisions, accessories, price, delivery and warranty.
Discuss the requirement, existing equipment and site constraints.
Confirm the equipment configuration, BOM and equipment prices.
Confirm the local installation scope and costs with the responsible team.
Agree the final quotation, deliverables, testing, acceptance and support before work starts.
Specify the checks required: model and accessory count, configuration record, agreed functional checks and shipping documents. Tests, calibration and inspection services must be included in the scope; they are not implied by a catalogue listing.
Send the order or case reference, model, symptom and useful photos. We review the issue and applicable terms before agreeing repair, replacement or additional technical work. Confirm return instructions before shipping equipment. Share remote access only after scope and authorization are agreed.
If a device needs attention →Review our company and cooperation scope, or use the editable templates to prepare a project. No contact details are required to download.
Company identity, responsibilities, quotation checklist, documents and support process.
Version 1.3 · 2026-10-02 · EN · PDF
Download PDFEditable requirements, equipment review and acceptance checklists, plus a worked data payload example.
Version 1.1 · 2026-10-07 · EN · ZIP
Download ZIPUse these files to prepare requirements and compare options. Request the selected model’s wiring and protocol documents separately.
Contact Andy about equipment, farm planning or a technical problem. Include your country and a short description so we can check the equipment and connections. We confirm any additional engineering work and its cost with you before proceeding.
Based in Taichung, Taiwan. Contact us by WhatsApp, email or the project form.
Know who you are working with →Compare interfaces, power, maintenance and data handling before choosing equipment. Each guide includes questions you can bring to the project discussion.
Browse technical guides →