Greenhouse control · 40-second overview

Greenhouse Relay Control: Points, Contacts and Local Operation

Product overview with English on-screen explanations. No audio. Read the chapter summary below.

List the equipment you want to control before choosing a panel. Fans, pumps and other loads need the correct control points, motor starters and local operating arrangements. The relay panel connects the control plan to the equipment; electrical installation is carried out by the local team.

Compare the equipment and connections

Control points

4, 8 or 16 relay control points.

Count independently controlled loads and define their manual and automatic operation.

Data connection

RS485 Modbus RTU; RJ45 Ethernet with Modbus TCP and Web Service.

Match the sensor and receiving-system interfaces. Mobile data requires the selected communications option.

Dry contact

Contact current less than 1 A; maximum 250 VAC.

Use correctly rated starters or contactors for motors. Include existing electrical protection and interlocks in the design.

Panel supply

110/220 VAC, 50/60 Hz; listed panel consumption 100 W.

Select the enclosure, site supply and installation scope together.

  • The video shows a detail of the 16-point panel switch bank.
  • Remote commands, schedules and interlocks need an agreed control plan. They do not replace local electrical protection.
  • SunGene supports equipment selection and the agreed integration. Local electrical teams handle construction, installation and wiring.

Video chapters

  1. 0:00

    Choose the control points

    4, 8 or 16 relay control points for a greenhouse equipment plan. The panel detail shown has 16 switch positions.

  2. 0:08

    Connect sensors and control

    RS485 Modbus RTU, Ethernet Modbus TCP and Web Service. The data connection and control plan work together.

  3. 0:16

    Use the relay contact correctly

    Dry contact: less than 1 A, up to 250 VAC. Connect motors through correctly rated starters or contactors designed for the load.

  4. 0:24

    Keep local control in the plan

    Define manual operation, schedules and equipment interlocks. Local electrical teams handle installation and wiring.

  5. 0:32

    Send the loads and operating plan

    List the fans, pumps or other loads, existing starters and required control points.

Specifications and application planning

Send the details for your equipment list

Include a drawing, equipment list or a brief description of the site. These details help us match the instruments and connections.

  • Load list and electrical ratings
  • Required control points and operating sequence
  • Existing starters, contactors and protection
  • Panel location, supply and data connection