Skip to content
SunGeneAgricultural IoT
← Agricultural solutions

Cold rooms, warehouses and storage zones

Post-harvest storage and multisite monitoring

Bring temperature, humidity and site status into a workflow that fits your storage operation.

Discuss Your Project
Agricultural setting for cold rooms, warehouses and storage zones

The field requirement

Measurements and equipment on site

Define zones, useful events and the data to retain. Storage thresholds and procedures are agreed with the operator for the products concerned.

Who handles each part?

SunGene handles equipment sourcing, farm system architecture and the agreed software or integration work. On-site construction and installation are carried out by local teams; we can help you find and coordinate a suitable partner.

System architecture & engineering details
  1. 01Field sensingSoil, weather, water & equipment
  2. 02Data acquisitionInputs, mapping & field power
  3. 03ConnectivityWired, wireless & recovery
  4. 04Platform integrationYour platform or a suitable service
  5. 05Alerts & decisionsAgreed views, exports & workflows
Equipment and functions are selected for each project. Control work also requires agreed command authority, local protection and outage behaviour.

Sensors and approved door-status signals → gateway → network → multisite platform → history, exports and alerts.

Site & interface review

Check power, interfaces and installation conditions

  • Probe placement and storage conditions
  • Calibration and recording frequency
  • Network loss, timestamps and retention
  • Site access and alert responsibility

Working with what is already there

Review existing equipment for reuse.

Existing controllers and loggers can be reviewed for reading or export. Access rights, interfaces and retention are confirmed together.

Review equipment compatibility

See where the system fits

Our project role

Equipment, data connections and operating documents

01

Zone and data requirements

02

Equipment and interface review

03

Platform, access and retention configuration

04

Pilot evidence and operating documents

Your proposal lists the selected equipment, software functions, checks, site responsibilities and support. Share your existing equipment and site conditions so we can define the configuration.

See our integration services

Useful before you begin

Related installation and selection guides

Related equipment families

Equipment for this system

Select the version for your controller, power and site.

Contact SunGene

Ask about equipment,
planning or a system fault.

Tell us your country and what you want to measure or fix. A site photo or equipment list helps us check the options.