Equipment selection guide
4G LTE Farm Monitoring Equipment Plan
Plan a farm monitoring equipment list with compatible sensors, a 4G RTU or gateway, field power, enclosure and the required data connection.
Product-family illustrations
Compare individual equipment specifications ↓1. Purpose
Collect several farm measurements through a cellular data connection.
2. Suitable sites
Irrigation pumps, storage tanks, weather points and remote growing areas.
3. What to send
Send the country, sensor list, required readings, available power, operator and receiving application.
Site conditions to check
Compare power, communication and equipment requirements for irrigation, pumps, soil and weather monitoring.
Agricultural irrigation and farm pumps
Compare pump contacts, motor current and water flow before choosing what to monitor at your farm.
Power for remote water, soil and weather stations
Calculate sensor, logger and radio loads before choosing a battery and solar panel. Include reporting intervals and maintenance visits.
Choose equipment for your farm
Send the country, measurements, existing instruments, power and network, and where your team needs the readings.
When to use this guide
Plan a small farm installation before extending it to more points. List each measurement, its output and supply, then choose the cellular receiver, field power and data destination.
Individual equipment specifications

An outdoor monitoring station
Illustration: outdoor monitoring station with weather sensor, solar supply, enclosure and field probe.
Build the list from the farm measurements
List water level, flow, pressure, pH or EC, soil conditions, weather readings and pump contacts as separate points. Record the range, output and supply for each instrument. Keep soil EC and water EC as separate measurements.
Choose the cellular receiver and data path
Match the sensors to the documented inputs and Modbus collection of the selected RTU or gateway. The documented RTU configuration supports MQTT and transparent TCP / UDP. Include the target country, operator, LTE bands, SIM/APN, antenna and receiving endpoint with the equipment list.
Plan mounting and power together
Include the enclosure, cable entries, protective devices, mounting and maintenance access. Calculate the complete sensor, receiver and modem load before sizing a solar supply or battery. Local pump control, overflow protection and electrical safety remain with the site installation.
Plan the equipment and data connection
Measure at the farm
Separate sensor readings and pump contacts matched to the farm task.
Match the connection
Compatible RTU inputs, the country and operator’s cellular configuration, and complete field power.
Use the readings
The agreed MQTT or transparent TCP / UDP data path and receiving records.
Example equipment and data path. Select each instrument, receiver, power supply and receiving interface as part of the equipment list.
Key points
- Separate sensor points with documented outputs
- 4G receiver selected for the country and operator
- Enclosure, antenna, mounting and complete field power
- Defined records, integration tests and site responsibilities
Technologies
- 4G LTE
- RS485
- Modbus RTU
- MQTT
- Field power
- Outdoor enclosure selection
Related pages
Official technical references
Protocol specifications for the connections described in this guide.
FAQ
What is included in a farm equipment plan?
The plan identifies the selected sensors, receiver, antenna, field power, enclosure and accessories. It also assigns the receiving application, integration work and local installation responsibilities.
What should I send for a quotation?
Send the country, measurement list, approximate point count, sensor outputs or register maps, operator, power source, receiving application and quantity. A site photo or layout helps with mounting and connections.
How do the readings reach our application?
The selected RTU or gateway delivers the agreed fields through its documented interface. The documented RTU configuration supports MQTT or transparent TCP / UDP. Include any additional protocol conversion, authentication and data storage in the integration scope.
Get selection help
Tell us what you want to measure and where. Send a model number or site photo if you have one.



