
Connect separate fields and facilities
Review coverage, equipment identity and the path into your chosen platform.
Read the guideRead farm water and electricity meters without making a manual round for every reading. Connect documented meter outputs to useful irrigation and equipment records.
1. Purpose
Collect water or energy readings from farm meters with a documented data output.
2. Suitable sites
Irrigation pump panels, greenhouse equipment and water-supply meters.
3. What to send
Send meter photos or documents, the country and point count. Include the readings and update interval the farm needs.
Which farm point needs connecting?
Send meter photos or documents, the country and point count. Include the readings and update interval the farm needs.
Keep the meter identity, time, unit and equipment served with each reading. Existing meters can be reviewed before adding new instruments; the output document determines the collection method.
Equipment photographs: SG-EM-206, SG-EM-219, SG-EMF-102. Equipment and connection diagrams.
Farm task
Bring water use, pump energy and greenhouse equipment readings into farm records. Start with the documented interfaces on existing meters or select suitable new instruments.

Product photograph
Pictured: SG-EM-201 — Single-phase DIN-rail energy meter.
Energy or water totals with the meter identity, scale and unit retained.
Demand, power, flow or rate data collected at an agreed polling and upload interval.
Offline, communication timeout, power loss and last successful reading.
Farm block, meter and equipment identity with timestamps and consistent units.
Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.
Data destination
Customer platform or an agreed third-party service
Path 1
Best for: Several documented Modbus meters at a farm panel or equipment room.
Path 2
Best for: A separate farm meter or water point with a suitable cellular connection.
Related equipment
The exact model, interface, enclosure and certificates are confirmed against the project before quotation.
Four-module three-phase DIN-rail meter family for panel energy monitoring, with direct-connected 80 A or 100 A configurations and RS485 Modbus on selected variants.
Direct-connected three-phase four-wire energy meter for circuits up to 100 A, with an RS485 hardware option for compatible remote-reading systems.
Bidirectional electromagnetic flow meter for conductive liquids, with selectable ±0.5% or ±0.2% accuracy and order-code options for 4-20 mA, pulse, RS485 Modbus, power and liner.
Connect RS485, RS232 or RS422 field devices to Ethernet with 1-, 2- or 8-port serial-server options for Modbus bridging and direct IP communication.

Cellular RTU gateway for irrigation pump stations, farm water telemetry and remote farm monitoring — collects RS485, analog and digital signals and uploads data over 4G LTE.

Product photograph. Pictured: SG-PRS-172 — Industrial Pressure Transmitters.
Flow, pressure and pump status are separate measurements at the irrigation point. Include the available signals, supply and receiving input in the equipment request.
View product specifications →
View product specifications →
Yes when addresses, baud rate, cable topology, polling load and gateway capacity are suitable.
Yes when the pulse constant, electrical interface and counter behavior are documented.
Buffering and retry depend on the selected gateway. State the outage duration and reporting gap the project must tolerate.
Track pump and fan run contacts, current or energy use. Select the signals available at each farm panel and the records your team needs.
Tell us what you want to measure and where. Send a model number or site photo if you have one.