Read energy use at irrigation pumps, greenhouse fans and farm panels. Compare existing meter interfaces, collection hardware and data records.
Hardware in this guide
Product-family illustrations. See each product page for specifications and options.
Planning example
An existing meter on an irrigation pump panel
Collect documented meter values and compare them with pump operation in the farm system.
- 01
Check the meter
Identify the model, interface, registers and the values already available.
- 02
Select collection
Match the serial, pulse or documented wireless interface to the receiving hardware.
- 03
Keep the identity
Store meter ID, equipment, reading time, scale and energy unit.
- 04
Compare operation
Review energy with pump hours or flow where those measurements are available.
Electrical installation and any billing use require the selected meter and applicable local requirements to be checked by the responsible team.
What does the farm need to check?
Send a meter or panel photo, phase count and current range. Include the meter document, equipment served, country, point count and reporting interval.
Problem to solve
Farm energy records are useful when each meter is tied to the equipment and reading time. Review the existing interface before adding a new meter or gateway.
Measurements that matter
- kWh and demand
- Voltage, current and power factor
- Meter online status
- Optional alarm thresholds
Suggested hardware configuration
- RS485 or wireless energy meter
- CT or direct-connect meter option
- Gateway or NB-IoT path
- MQTT/API/EMS data export
Equipment in the system
Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.
Field equipment options
Compare the measurements and accessories for this site. Confirm each selected signal, electrical interface and connection to the acquisition device.
AMI Three-Phase CT Smart Electricity Meter
View product detailsDIN-Rail Three-Phase Energy Meter
View product detailsSee other field equipment (1)
Matching data collection device
Confirm whether the selected outputs need a PLC, RTU, logger or gateway. Match the inputs, power and destination protocol before quotation.
Data destination
Customer platform or an agreed third-party service
Information needed before quotation
- Phase and current range
- Meter count
- Panel layout
- Backend data format and reading interval
Recommended next steps
- Review farm equipment and energy monitoring
- Compare cellular connections
- Send the existing meter document
Related pages
FAQ
What should I send for equipment selection and a quote?
Send a meter or panel photo, phase count and current range. Include the meter document, equipment served, country, point count and reporting interval.
Can we connect an existing energy meter?
Send the meter interface document and the values you need. We check the physical connection, protocol and register list before selecting a gateway; a local display alone does not establish a data interface.
Can these readings be used for customer billing?
Operational monitoring and billing have different requirements. Confirm the selected meter, applicable approval and billing rules with the responsible utility or project designer before using records for charging.