Problem / solution guide
Remote Energy Meter Reading
Remote energy meter reading hardware for buildings, solar sites, cabinets and distributed assets.
Hardware in this guide
Product-family photos. See each product page for specifications and options.
Equipment selection, or help with the whole farm?
Send your country and a description of the equipment or problem. We can recommend a device, prepare a kit or plan the farm equipment and integration. Add technical details when available.
Compare ways to work with SunGene →Problem to solve
Manual energy reading delays billing, troubleshooting and efficiency analysis. A meter reading path should define meter type, communication and data ownership.
Measurements that matter
- kWh and demand
- Voltage, current and power factor
- Meter online status
- Optional alarm thresholds
Suggested hardware configuration
- RS485 or wireless energy meter
- CT or direct-connect meter option
- Gateway or NB-IoT path
- MQTT/API/EMS data export
Equipment in the system
Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.
Data destination
Customer platform or an agreed third-party service
Information needed before quotation
- Phase and current range
- Meter count
- Panel layout
- Backend data format and reading interval
Recommended next steps
- Review building energy monitoring
- Compare NB-IoT and 4G LTE
- Select meter and gateway path
Related pages
FAQ
What does SunGene need before quoting Remote Energy Meter Reading?
For a quotation, send these details: Phase and current range; Meter count; Panel layout; Backend data format and reading interval. We use them to select sensors, gateways, power and the data connection.
Can we connect an existing energy meter?
Send the meter interface document and the values you need. We check the physical connection, protocol and register list before selecting a gateway; a local display alone does not establish a data interface.
Can these readings be used for customer billing?
Operational monitoring and billing have different requirements. Confirm the selected meter, applicable approval and billing rules with the responsible utility or project designer before using records for charging.
What should I check before selecting equipment?
Record these site details: kWh and demand; Voltage, current and power factor; Meter online status. Check the sensor output, receiving input, power supply and installation conditions together. Confirm any required approvals for the exact model and destination.


