Skip to content
SunGeneAgricultural IoT
← All industries

Energy & Solar

Generation, metering and yield monitoring for solar sites and energy assets.

Hardware families for this requirement

The exact model, interfaces and enclosure are confirmed in the written quotation.

Equipment selection, or help with the whole farm?

Start with a country and a short description. We can help select one device, configure a kit, or plan the farm equipment list and agreed integration. Technical details can follow.

Compare ways to work with SunGene →

Start from the site condition

Models and quotation stay on sungeneiot.com. Use the matching field condition first.

Challenges

  • Distributed sites underperform silently
  • No remote view of inverters or meters
  • Downtime discovered weeks later

Typical hardware

  • Solar site monitoring
  • Remote meter reading
  • Energy data collection

Is this the right page?

Use this page for distributed solar, facility metering or remote energy assets where the buying task is to collect trusted meter, inverter and weather data without replacing working field equipment.

facility energy panel with meters, current sensors and an RS485 gateway

Facility metering context

Sensors, interfaces, enclosure, power and mounting are confirmed against the actual project before quotation.

See where the system fits

What buyers usually need to monitor

Generation and consumption

Import, export, active energy, power and phase data from meters or supported inverter registers.

Solar context

Irradiance, module or ambient temperature and selected weather variables used to interpret generation trends.

Equipment status

Inverter faults, breaker or contact states, gateway heartbeat and site power alarms.

Data quality

Timestamp, polling interval, missing-device alarms and register scaling for repeatable reporting.

Equipment in the system

System design, software integration, PLC/SCADA programming and site installation responsibilities are agreed in the written project scope.

Typical hardware paths

Path 1

Existing inverter data

Best for: Sites with documented Modbus registers and a stable local network.

  1. 1Inverter register map
  2. 2RS485 or Ethernet gateway
  3. 3Data normalization
  4. 4Customer platform

Path 2

Independent revenue or sub-metering

Best for: Projects that require a separate measurement point.

  1. 1Selected meter and CTs
  2. 2Panel communication
  3. 3Data gateway
  4. 4Energy reporting system
Show the remaining deployment path

Related hardware

Hardware families for this requirement

Find matching hardware →

The exact model, interface, enclosure and certificates are confirmed against the project before quotation.

Confirm before selection

  • Confirm single- or three-phase topology and current range.
  • Provide inverter and meter register maps.
  • Define whether readings support operations, allocation or regulated billing.
  • Confirm CT type, panel space and installation responsibility.
  • Define weather parameters, mounting and cleaning access.
  • Specify the customer endpoint and acceptable data interval.

Send this for a useful quote

  • Site count and one-line diagram
  • Meter or inverter makes and register maps
  • Voltage, phase and current range
  • Required weather inputs
  • Network and cabinet power
  • Target country and quantity

Scope boundaries

  • Metering suitability depends on the selected model, CT arrangement and local rules; no billing-grade claim is made without matching evidence.
  • SunGene supplies monitoring hardware and data handoff, not grid protection, inverter control or guaranteed energy yield.

Hardware reference for the final selection

Exact model, interfaces and enclosure are confirmed in the written quote.

Official references

Buyer questions

Can you read an existing inverter or meter?

Yes when the device exposes a documented interface and register map. Share the exact protocol documents before gateway selection.

Is a weather station always required?

No. It is useful when irradiance and environmental context are needed to explain performance, but the required variables should follow the project objective.

Can data go to our energy platform?

Yes when you provide the protocol, endpoint, authentication method and payload requirements for review.

Related solutions

Reference field scenarios