Skip to content
SunGeneAgricultural IoT
← Farm equipment configurations

Farm equipment · Connections · Site planning

Farm Pump & Greenhouse Energy Monitoring Kit

Plan current and electrical measurements for irrigation pumps, greenhouse fans and farm control panels. Choose run-status sensing or metering around the existing circuit.

Wireless Split-Core CT Current Sensor Family
Split-core current sensing is one option for observing current on an existing farm circuit.

First decide whether the farm needs a run indication, current readings or electrical energy records. Those measurements use different equipment. Keep the existing pump and greenhouse controls in place while planning the monitoring points.

01

At the circuit

Identify phases, voltage, current range and the measurement required.

02

At the collection point

Wireless current sensors use a matching radio receiver. Wired meters use their documented connection to the collection device.

03

In the farm records

Keep energy readings separate from run contacts, current and water-flow measurements.

Choose the arrangement for your farm

Bring several panel readings together

List the meters, contacts and reporting points for the RTU or gateway. Keep the monitoring connection separate from local control and protective devices.

Equipment in the plan

Information for your equipment list

  • Equipment and panel count
  • Circuit voltage, phases and current range
  • Run indication, current or energy measurements required
  • Existing meter, network and reporting interval

What the project plan covers

  • Sensor or meter selection for each circuit
  • Collection-device and interface list
  • Panel connection and local-installation scope
  • Agreed readings and test points

Order individual devices or plan the equipment, data connection and local installation together. SunGene handles equipment selection and agreed integration work; the local team handles site installation and safety.

Checks at the first measurement point

  • Compare readings with the selected meter or a suitable reference at the panel.
  • Check the receiver and decoder for the wireless current-sensor path, separately from wired meter connections.
  • Keep units and current-transformer ratios consistent in the receiving system.
  • Use flow or pressure data when the farm also needs to check water delivery.

Use these checks to agree the sample or first-site acceptance plan.

Questions about this configuration

Does a current sensor show how much water a pump delivers?

Current indicates an electrical condition. Measure water delivery with a suitable flow meter or pressure measurement alongside the pump signals.

Is current sensing the same as energy metering?

No. Select a meter and the required voltage and current connections when electrical energy is the quantity needed. Choose current sensing for the current measurement supported by the selected sensor.

Who connects equipment inside the electrical panel?

The responsible local electrical team handles panel wiring and site safety. SunGene prepares the selected equipment and agreed data-integration work.

Plan the measurements across the farm