Skip to content
SunGeneAgricultural IoT

Regional project guides

UAE Smart Building Energy Monitoring

For UAE-bound buyers, SunGene supports hardware selection, protocol fit and certificate review per shortlisted model. The written quotation assigns local installation, commissioning and platform configuration to the buyer or its appointed contractor.

RS485Modbus RTUBACnetEnergy meterMQTT

Typical Use Cases

  • Commercial building submetering
  • Facility energy dashboard data
  • HVAC and tenant load analysis
  • Integrator hardware selection

Measured Parameters

  • kWh and demand data
  • Circuit load trend
  • Meter communication status
  • Optional temperature and humidity context

Recommended Hardware Bundle

  • DIN rail energy meters
  • CTs and power meters
  • RS485 / BACnet gateway
  • Optional cabinet sensors
facility energy panel with meters, current sensors and an RS485 gateway

Energy metering in a control panel

Illustration: facility energy panel with meters, current sensors and an RS485 gateway.

See where the system fits

Equipment in the system

Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.

Integration Path

  • Modbus RTU meter bus
  • Documented BACnet or Modbus TCP handoff
  • Documented MQTT handoff to a customer-owned platform
  • Certificate check by selected hardware

What SunGene Prepares

  • Equipment list with proposed models and accessories
  • Wiring, protocol and data-format requirements for the trial
  • Packaging and document requirements, where needed
  • Separate quantities and costs for samples, a pilot and repeat orders

What the Customer Provides

  • Panel layout and meter count
  • BMS protocol
  • Target certification needs
  • Pilot site schedule

Hardware reference

Product-family photos; the model and enclosure may vary.

Related Pages

Related selection guides

FAQ

What does SunGene need to quote UAE Smart Building Energy Monitoring?

For a quotation, send these details: Panel layout and meter count; BMS protocol; Target certification needs; Pilot site schedule. We use them to select sensors, gateways, power and the data connection.

Can this connect to our existing platform?

Most projects use one of these paths: Modbus RTU meter bus; Documented BACnet or Modbus TCP handoff; Documented MQTT handoff to a customer-owned platform. The final payload and protocol are confirmed before sample shipment.

Is SunGene a SaaS platform provider?

SunGene can provide agreed software, platform connections and data integration alongside equipment supply and farm BOM planning. We define functions, account ownership, recurring fees, testing and maintenance in the quotation. Local teams carry out onsite construction; SunGene can help coordinate them.

What is checked before samples are shipped?

We agree the selected models, accessories, power and interfaces. For connected equipment, we also check the destination network, protocol and data format. Required certificates must apply to the proposed model and target country.