Farm RS485, Ethernet & 4G Data Collection Kit

Connect soil, weather and irrigation measurements to a farm data system. Compare wired gateways, cellular RTUs and the inputs needed at each field point.

4G/LTE Industrial RTU Gateway
A cellular RTU collects compatible field signals and provides a route from the farm to the receiving system.

Start with the signals already available at the farm. A soil probe may use RS485, a level transmitter may use an analog output, and a pump panel may provide run or fault contacts. Select the collection device around those signals and the route into your records.

01

Measure

Soil, weather, water level or pump-panel signals.

02

Collect

Match the signal, supply and register map to the RTU or gateway.

03

Keep the records

Map values, units, equipment identity and timestamps into the receiving system.

Choose the arrangement for your farm

A remote irrigation or weather point

Use a cellular RTU when the point needs its own mobile connection. Count each RS485, analog and contact input, then include the RTU and sensors in the power budget.

Several controllers and data interfaces

Use an edge gateway where field equipment and the receiving platform need a documented protocol path. List the device connections and the upstream data format.

Equipment in the plan

Information for your equipment list

  • Country and number of field points
  • Sensor or controller list and available signal outputs
  • Register maps or wiring diagrams for existing equipment
  • Power, network coverage and receiving platform

What the project plan covers

  • Equipment and input list for each point
  • Signal, power and data-connection plan
  • Register or payload field list for the receiving system
  • Bench and first-site test checklist

Order individual devices or plan the equipment, data connection and local installation together. SunGene handles equipment selection and agreed integration work; the local team handles site installation and safety.

Checks at the first measurement point

  • Compare each reported reading with the field instrument, including units and scaling.
  • Check equipment identity, time settings and the agreed reporting interval.
  • Test the agreed reconnection and alarm behaviour at the first point before repeating the configuration.

Use these checks to agree the sample or first-site acceptance plan.

Questions about this configuration

Can one RTU collect different kinds of farm signals?

Select the RTU by its actual RS485, analog and digital inputs. Count the signals from each device and match their electrical requirements, supply and communication settings.

Can an Ethernet gateway replace a cellular RTU?

An Ethernet gateway needs a network path at the site. A cellular RTU provides a mobile uplink on its selected regional configuration. The choice also depends on the field inputs and power supply.

What do you need from an existing controller?

Send its model label, available ports and register map or protocol document, together with the values the farm wants to record and the destination system.

Plan the measurements across the farm