Farm equipment selection
Buy a Gateway or Plan a Complete Farm Monitoring Point?
Replace or add a gateway, or prepare the sensors, collector, power and enclosure for a farm monitoring point. Compare the equipment and installation responsibilities.
Choosing equipment for your farm?
Send your country, measurement points and existing equipment. We can quote an individual device or prepare the sensors, power and data connection for a farm monitoring point.
Hardware in this guide
Product-family illustrations. See each product page for specifications and options.
Plan the connection at your farm
Planning example: compare connecting an existing irrigation meter with equipping a new remote water point. List which parts are already on site and which parts the quotation must include.
- 1
Existing equipment and missing functions
- 2
Selected sensor and collector list
- 3
Power, mounting and data connection
- 4
Agreed test and handover
At your site
Keep the equipment that already meets the measurement and connection requirements. A gateway purchase can fill one missing function. A complete point needs a coordinated list of instruments, collection inputs, power, enclosure and the receiving connection.
Decision table
Equipment scope
- Gateway only
- The missing collector, conversion or network function
- Complete monitoring kit
- Selected instruments, matching collector, power and accessories
- Guidance
- List what already works on site before adding equipment.
Interfaces and tests
- Gateway only
- Existing sensors and the gateway functions needed to read them
- Complete monitoring kit
- Matching connections across the complete measurement point
- Guidance
- Include configuration and record checks in the agreed scope.
Site work
- Gateway only
- Installation and integration around the existing equipment
- Complete monitoring kit
- Mounting, wiring, power and integration for the new point
- Guidance
- Set out the work carried out by SunGene and the local installation team.
Equipment in the system
Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.
Data destination
Customer platform or an agreed third-party service

Application illustration. Mark the measurement points, power and cable routes on a farm layout for an equipment request.
List the parts for one field point
Mark the measurement points, field power and receiving system on a farm layout. Include equipment already in use and the number of points to be added.
Request farm equipmentChoose Gateway only when
- Existing instruments, power and wiring meet the requirement
- The missing function is documented
- The gateway fits the existing and receiving interfaces
Choose Complete monitoring kit when
- A new measurement point needs a coordinated equipment list
- Sensors, inputs, power and mounting are planned together
- Testing, integration and local installation responsibilities are defined
Information needed for quotation
- Equipment already available and its documents
- Missing measurement or connection
- Power, enclosure and mounting conditions
- Quantity, country and receiving system

Application illustration. Outdoor sensor connections: leave room for cable entries, the antenna and servicing.
Plan the enclosure and field connections
Locate the power supply and data connection at the field point. Leave access for cable entries, the antenna and servicing.
Request farm equipmentRelated pages
FAQ
Can I request just one replacement or additional device?
Yes. Send its function, the existing equipment model and interface, quantity and delivery country. For a complete monitoring point, include the measurements, power and receiving system so the equipment list covers the required connections.
What should I send for an equipment quotation?
Send the country, measurements, equipment already on site, available power and the system receiving the data. Add a site sketch or instrument photo and the approximate point count.
Can I buy individual devices or request a complete farm monitoring point?
Yes. A device request can cover a missing measurement or connection. A complete point brings together the instruments, matching inputs, power, enclosure and agreed data connection, with local installation responsibilities set out in the proposal.
What should be checked before adding more farm sites?
Compare the field readings with the records received by the platform. Check units, timestamps, interruptions and recovery, then record the equipment configuration and the team responsible for service.