
Energy Data Acquisition Kit
KIT 1Base hardware
- • Energy meter and split-core CT selected for the circuit
- • RS485/Modbus data collection
- • Protocol or cellular gateway where required
- • Applicable wiring and register map
Application 03
Configuration confirmed before quotationMetering, leak, pump-room and gateway hardware for ESCOs, MEP contractors, panel builders and BMS integrators.




Representative product-family images. The exact model, interfaces and enclosure are confirmed in the written quotation.

Facility metering context
Representative site context. Sensors, interfaces, enclosure, power and mounting are confirmed against the actual project before quotation.
Final system design, software integration, PLC/SCADA programming and site installation are handled by the customer or their system integrator.

RTU / Data Logger
Customer system
Customer's SCADA / Cloud / PLC System
Two RFQ-ready definitions
These are configuration starting points, not fixed stock bundles. Exact hardware, documentation and availability are confirmed in the written quotation.


Images show representative product-family hardware. The selected enclosure, connectors and exact specifications are confirmed before quotation.





Representative product-family images. Exact model, interfaces and enclosure are confirmed in the written quote.
Primary selection guide
Review field interfaces, Modbus behavior, upstream protocols and failure handling before selecting retrofit gateway hardware.
Use these guides to confirm field signals, communications and installation constraints before choosing a hardware family.
SunGene supplies the selected meters, sensors, gateways and applicable integration documentation for delivery into the named BMS, SCADA or customer platform.
The hardware supplies measurement data. Savings are evaluated by the customer or its energy-service partner from the engineering changes, operating practices and verified baseline.
Compatibility is checked against exact protocols, versions, point lists and selected hardware.
Only when the exact model and applicable local metrology approvals have been verified for that use.