Problem / solution guide
Multi-Site Well & Water Monitoring
Connect level, pump and selected water-quality readings from several wells or water sites. Compare new sensors, existing equipment and the data path into your receiving system.
Planning example
Wells and storage tanks on separate farm blocks
Use the connection suited to each point while keeping the records consistent in the receiving system.
- 01
List the water points
Record the site, measurements, existing equipment and access.
- 02
Choose each connection
Check local power and LoRaWAN or cellular coverage for each point.
- 03
Use common records
Keep site and point IDs, units, event time and last received time.
- 04
Verify the first sites
Compare readings with local instruments and test delivery and missing-data behavior.
A shared dashboard does not require one physical gateway. Select connections from the actual site layout.
Which wells or water sites need connecting?
Send a site list or map, the readings needed at each point and the country. Include existing instruments, power, coverage and the receiving platform.
Connect the readings you need from each site
Plan each well’s readings and data connection, then combine the records in the receiving system. A group of wells can include new sensors, existing pump panels and selected water-quality points, with each reading kept tied to its location.

Equip several wells or water points
Collect level, delivery and pump-status readings from sites with different power or network conditions.
Equipment to select
A site-specific sensor and logger or RTU arrangement, followed by an agreed data connection to the receiving system.
List the sites and measurement points. Select the sensor, network and supply for each location rather than assuming one package fits every well.

Connect instruments already installed
Keep usable meters, sensors and pump panels while bringing their readings into a common record.
Equipment to select
Compatible RTU or gateway inputs matched to documented contacts, analog signals or serial registers at each site.
Send the existing models or interface documents. Agree site IDs, units, timestamps and missing-data status with the receiving-platform owner.

Add quality probes at selected sites
Compare specified water-quality readings at source outlets, mixing tanks or other accessible measurement points.
Equipment to select
Separate pH, EC or other required probes, or a selected multi-parameter assembly, with compatible data inputs.
Define parameters and maintenance at each point. Keep a stale or failed reading distinct from a measured value; operators set response limits.
Send the site list and readings you need
- Country and approximate number of wells or water points
- Readings needed at each site and equipment already installed
- Power, network and the platform or person receiving the data
The configuration identifies field equipment and the data handoff. Dashboard operation, alarm response, SIM accounts and installation responsibilities are agreed with the project team.
Related hardware families
Hardware in this guide
Product-family illustrations. See each product page for specifications and options.
Problem to solve
A group of wells can have different instruments, power and mobile coverage. Choose the measurement points and equipment at each site, then agree how readings, alarms and missing data reach the receiving system.
Measurements that matter
- Well and measurement-point identity
- Level, pump status, pressure or flow as required
- pH, EC or other selected quality measurements at accessible points
- Reading time, units and missing-data status
Suggested hardware configuration
- Selected level, pump and water-quality instruments at each site
- Compatible logger or RTU and the site power supply
- Selected cellular, wired or LoRaWAN communication path
- Documented readings delivered to the agreed customer system
Equipment in the system
Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.
Data destination
Customer platform or an agreed third-party service
Information needed before quotation
- Country and approximate site count
- Measurements and existing instruments at each site
- Power and network conditions
- Receiving platform and who responds to alerts
Recommended next steps
- Select the measurements at one representative well
- List sites with different power or network conditions
- Agree identifiers, units and data delivery before expanding
Related pages
FAQ
Can we keep the instruments already installed at each well?
Send the existing models and interface documents or clear equipment photos. A compatible logger or gateway can be selected for documented contacts, analog signals or serial registers. Match each point to its site, units and timestamp before combining the records.
Can the same project include water-quality measurements?
Yes. Select separate pH, EC or other required probes, or an appropriate multi-parameter assembly, for the accessible water points. Confirm mounting, outputs, cleaning and calibration at each site. Level, flow and water quality remain separate measurements.
What should operators see when a site stops reporting?
Keep the last received time and a missing-data or read-status indication alongside the reading. Agree the receiving system, warning delay and person responsible for a site visit. An old reading or failed read must not be treated as a current measurement.