Skip to content
SunGeneAgricultural IoT
All problem guides

Problem / solution guide

Remote Site Power Failure Alert

Power failure alert hardware for remote cabinets, pump rooms, solar sites and monitoring stations.

Hardware in this guide

Product-family photos. See each product page for specifications and options.

Equipment selection, or help with the whole farm?

Send your country and a description of the equipment or problem. We can recommend a device, prepare a kit or plan the farm equipment and integration. Add technical details when available.

Compare ways to work with SunGene →

Problem to solve

A missing site report can result from power loss or a communication fault. Monitor the power signal and last received update separately so the operations team can decide what to check.

Measurements that matter

  • Mains power state
  • Battery voltage
  • Gateway online status
  • Optional cabinet temperature

Suggested hardware configuration

  • Power status input
  • Backup battery or UPS signal
  • 4G gateway with heartbeat
  • Alarm payload for power and communication state

Equipment in the system

Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.

Information needed before quotation

  • Power source and voltage
  • Backup duration target
  • Gateway heartbeat interval
  • Alarm escalation workflow

Recommended next steps

  • Compare solar and mains power
  • Review outdoor field station kit
  • Define alarm routing

Related pages

FAQ

What does SunGene need before quoting Remote Site Power Failure Alert?

For a quotation, send these details: Power source and voltage; Backup duration target; Gateway heartbeat interval; Alarm escalation workflow. We use them to select sensors, gateways, power and the data connection.

Can a gateway report an outage after its own power is lost?

Only if the selected arrangement retains enough power and a working communication path to send the event. Review backup power, an outage input and the receiving system together; otherwise use a separate missing-data warning.

What should be tested when power returns?

Check device startup, restored communications, time settings and event acknowledgement. Agree how the outage and recovery will be shown to the operator before commissioning.

What should I check before selecting equipment?

Record these site details: Mains power state; Battery voltage; Gateway online status. Check the sensor output, receiving input, power supply and installation conditions together. Confirm any required approvals for the exact model and destination.