Problem / solution guide
Irrigation Pump Run Hours & Fault Monitoring
Record irrigation pump run hours, starts and faults. Choose a run contact, controller register or current measurement for the signal you need.
Hardware in this guide
Product-family illustrations. See each product page for specifications and options.
Planning example
Two irrigation pumps with existing run contacts
Plan separate records for each pump while keeping local control in the existing panel.
- 01
Identify feedback
Have the site electrician identify the run and fault signals and their electrical characteristics.
- 02
Read each pump
Select suitable digital inputs or documented controller registers.
- 03
Record operation
Keep pump identity, state changes and timestamps in the receiving system.
- 04
Review maintenance
Calculate hours from the agreed feedback and show gaps or controller resets in the records.
Add flow or pressure when the task is to confirm water delivery. Run feedback alone describes operation.
What does the farm need to check?
Send the pump count, country and a panel or controller photo. Include the available run and fault contacts, meter or drive documents, and the records your maintenance team needs.
Problem to solve
Maintenance records need the pump state and its timing. A start command, current reading and confirmed run contact can mean different things; identify the available feedback before counting hours.
Measurements that matter
- Run/stop state
- Fault contacts
- Runtime hours
- Pressure, flow or energy data
Suggested hardware configuration
- Digital input module or RTU
- RS485 meter input when available
- 4G LTE gateway
- MQTT or Modbus TCP handoff
Equipment in the system
Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.
Data destination
Customer platform or an agreed third-party service
Information needed before quotation
- Pump count and signal list
- Control cabinet layout
- Meter or VFD protocol
- Reporting interval and alarm priority
Recommended next steps
- Review pump station monitoring
- Compare Edge RTU and IoT gateway
- Prepare point list for quote
Related pages
FAQ
What should I send for equipment selection and a quote?
Send the pump count, country and a panel or controller photo. Include the available run and fault contacts, meter or drive documents, and the records your maintenance team needs.
What signal should we use to count pump run hours?
A run contact or supported controller register can identify the operating state. Confirm what that signal represents before calculating hours; a command to start the pump is different from feedback that it is running.
What makes the records useful for maintenance?
Keep start and stop times, accumulated hours and fault changes together. Agree how communication gaps and controller resets will appear in the record before comparing pumps or scheduling maintenance.


