Skip to content
SunGeneAgricultural IoT
All problem guides

Problem / solution guide

Irrigation Pump Run Hours & Fault Monitoring

Record irrigation pump run hours, starts and faults. Choose a run contact, controller register or current measurement for the signal you need.

Hardware in this guide

Product-family illustrations. See each product page for specifications and options.

Planning example

Two irrigation pumps with existing run contacts

Plan separate records for each pump while keeping local control in the existing panel.

  1. 01

    Identify feedback

    Have the site electrician identify the run and fault signals and their electrical characteristics.

  2. 02

    Read each pump

    Select suitable digital inputs or documented controller registers.

  3. 03

    Record operation

    Keep pump identity, state changes and timestamps in the receiving system.

  4. 04

    Review maintenance

    Calculate hours from the agreed feedback and show gaps or controller resets in the records.

Add flow or pressure when the task is to confirm water delivery. Run feedback alone describes operation.

What does the farm need to check?

Send the pump count, country and a panel or controller photo. Include the available run and fault contacts, meter or drive documents, and the records your maintenance team needs.

Problem to solve

Maintenance records need the pump state and its timing. A start command, current reading and confirmed run contact can mean different things; identify the available feedback before counting hours.

Measurements that matter

  • Run/stop state
  • Fault contacts
  • Runtime hours
  • Pressure, flow or energy data

Suggested hardware configuration

  • Digital input module or RTU
  • RS485 meter input when available
  • 4G LTE gateway
  • MQTT or Modbus TCP handoff

Equipment in the system

Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.

Information needed before quotation

  • Pump count and signal list
  • Control cabinet layout
  • Meter or VFD protocol
  • Reporting interval and alarm priority

Recommended next steps

  • Review pump station monitoring
  • Compare Edge RTU and IoT gateway
  • Prepare point list for quote

Related pages

FAQ

What should I send for equipment selection and a quote?

Send the pump count, country and a panel or controller photo. Include the available run and fault contacts, meter or drive documents, and the records your maintenance team needs.

What signal should we use to count pump run hours?

A run contact or supported controller register can identify the operating state. Confirm what that signal represents before calculating hours; a command to start the pump is different from feedback that it is running.

What makes the records useful for maintenance?

Keep start and stop times, accumulated hours and fault changes together. Agree how communication gaps and controller resets will appear in the record before comparing pumps or scheduling maintenance.