Skip to content
SunGeneAgricultural IoT
All scenarios

Design example

SCADA Retrofit for Utility Stations

Plan RTU or gateway data collection around the existing utility-station signals, cabinet and SCADA interface.

Design example: use the site requirements and equipment path below to plan your own configuration.

Hardware in this guide

Product-family photos. See each product page for specifications and options.

Planning a similar site?

Send the site count, signals, network, power and reporting target. We will return a comparable hardware configuration for quotation.

Site conditions to check

Compare power, communication and equipment requirements for irrigation, pumps, soil and weather monitoring.

Project team

A utility integrator planning retrofit hardware for distributed stations.

Challenge

The station signals need a documented read path that preserves the existing control system.

Equipment in the system

Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.

Site context

  • Legacy field signals and meters
  • SCADA or operations system already present
  • Cabinet space and power needed review

Approach

  • Build point list from existing signals
  • Select RTU/gateway path by protocol
  • Keep local alarm and northbound data needs separate

Hardware plan

  • Remote IO / RTU module
  • RS485 protocol gateway
  • 4G or Ethernet backhaul
  • Cabinet accessories

Hardware reference

Product-family photos; the model and enclosure may vary.

Integration path

  • Digital and analog I/O, RS485 collection
  • Modbus TCP or MQTT handoff
  • SCADA tag mapping support

Checks before rollout

  • Confirm the signal list and existing PLC or SCADA interfaces
  • Compare gateway-only equipment with any required I/O and power accessories
  • Test registers and upstream data while preserving the existing control workflow

Quote inputs

  • Point list
  • Existing protocol
  • Panel power and space
  • SCADA endpoint and tag naming rules

Related pages

FAQ

How can I use this design example?

Compare the measurement points, equipment connections and site checks with your project. Send the existing devices, available power and receiving system so we can check a suitable configuration.

Can telemetry be added while keeping the existing PLC and SCADA?

Yes, when an approved read path is available. Map the required signals and use a compatible RTU or protocol gateway. Confirm device roles, polling ownership, register maps and the receiving interface so the addition does not disturb the existing control system.

What should a SCADA retrofit pilot verify?

Check the required registers or I/O points, data types, timestamps, update interval and behavior after an interruption. Send the existing PLC or SCADA details, signal list, register maps and backhaul constraints before selecting the equipment.