Plan a monitoring point away from mains power
Start with the sensors, collector and reporting schedule. Solar and battery sizing depends on their load, local weather and the required operating time without charging.

Product-family illustration. Appearance and accessories depend on the ordered configuration.
An outdoor enclosure package brings the RTU, gateway, power supply, terminals and protection into one documented assembly. Confirm ingress protection for the selected enclosure, cable entries and complete assembly before ordering.
Appearance, connectors and included accessories follow the configuration confirmed in your quotation.
Related application hardware: Equipment Monitoring

Start with the sensors, collector and reporting schedule. Solar and battery sizing depends on their load, local weather and the required operating time without charging.
Remote water and environmental sites need a suitable mounting and enclosure arrangement. Cable entries, heat, grounding and surge protection are checked for the assembled system.
Share your current model, a photo or the connection you need. We help assess interfaces, power and the required configuration.
Get selection & integration helpPublic documents describe this product family and selection options. Wiring, register maps and compliance documents must match the model and version selected for your order.
Current online selection reference
Application selection guide
PDF · English
Tell us which documents you need. We check availability for the selected model and document revision.
Compare uses, interfaces and configuration options. These are selection references.
An SG code helps identify a sourcing option; it is not a substitute for the manufacturer model or its certificate.
Confirm the exact model, configuration, photograph, document revisions, accessories, price, delivery and warranty.
Tell us what you want to measure and where. Send a model number or site photo if you have one.
Example equipment arrangement. Check compatibility and agree who handles software, PLC/SCADA programming and site installation.
Data destination
Customer platform or an agreed third-party service
Check the installation, electrical interfaces and documents before choosing the model.
Site requirement
Application, medium, mounting and environment
Hardware configuration
Signal, protocol, power and enclosure
Your quotation
Model, quantity, certificates and delivery

Pump and motor monitoring
Illustration: pump and motor monitoring installation with bearing sensors and a field enclosure.
Compare adjacent hardware families for the same monitoring path.

Use an enclosure integration package when an RTU, gateway, power supply and field terminals must arrive as one documented assembly. The enclosure material, ingress target, internal heat, cable entries, grounding, surge protection and mounting are engineered from the actual bill of materials and site conditions.
Provide the complete device and terminal list plus dimensions, cable entries and bend radii before the enclosure size is selected. Calculate internal heat, supply, protection, grounding, surge and battery needs from the installed hardware and climate. Confirm wall / pole mounting, ingress target, material, corrosion exposure, service access and destination-country requirements.
Device BOM, dimensions and terminal count; Cable types, glands, connectors and entry directions; Power, protection, grounding, surge and heat load; Material, IP target, mounting and climate
Open the Application selection guide linked on this page. Use it to compare equipment options before requesting a configuration.
Check the field signal, supply, protocol and receiving platform against the selected model. The connection options listed on this page are a starting point; send your equipment model or interface document so we can check the combination before ordering.
This page is an application guide until a specific orderable model is confirmed. Available models are selected according to the required specification, interface, environmental rating and quantity.